Ventilation/dehumidification — the silent 24/7 load, with heat recovery. Part of the glass family — like our glass BESS, biogas plant and CHP.
Before grid connection, the voltage, frequency, and phase angle of the generator and the grid must match — incorrect synchronisation generates short-circuit currents and damages the generator.
connect… · anonymous reference plant · read-only from the process control system, real power calculated in-house … kW reactive power … kvar apparent power … kVA cos φ … Gen-voltage … V frequency … Hz excerpt from … plant measurements. To the detailed explanation page with video →

Monitored: continuous
The scenario: A drifting excitation shifts the cos φ without triggering a limit value, reactive power costs, or grid issues. The AI: detects the shift in proportion early and reports it before the protection system reacts. It identifies the trend before the limit value is reached.
Precise synchronisation prevents destructive short circuits and ensures the service life of the generator components. By monitoring the parameters, uncontrolled load jumps are avoided. This guarantees a stable feed-in and protects the hardware from thermal overload. Real power (kW) · Reactive power (kvar) → — kVA apparent power Calculation path: √(real power² + reactive power²)
Stromfee.US licenses the pool & wellness HVAC AI — proven in Europe, deployed on your existing plant. Single property, portfolio or chain.
Request software license →